Today I finished testing the fog machines and the controllers. The reason I didn't test all of them in one day is because I think it was so hot these last few days they were overheating and shutting themselves down. I could only test in the early morning while it was still relativity cool. I also finished fixing the broken lights in the Vortex and put up a few more speakers and low voltage boxes.

Justin spent the day taking down the plastic that was covering the plants in Fishpuppet. Most of it was huge sheets of plastic 100 feet by 20 feet long. The people that put it up last year were a little lazy and didn't cut the sheets to size. He dragged and rolled the sheets to the front of the show by himself.

Jesse and Kurtis finished the second room and started on the third. We call the second room the spike room and it is one of the best looking rooms in the show.

Ted continued fixing the Thermo-Ply on the Catacombs arches. The last time the Thermo-Ply was put up roofing nails were used instead of screws with washers so its taking a very long time to fix each arch. The bees and other things aren't helping either.

Julio is continuing making repairs in Catacombs and Kevin did more animatronic stuff.

The Video is Kevin, Kurtis, Ted, Jesse and Justin in the third room in the new Temple.