
Today Bryan leveled out the Temple area with a bobcat and stone dust. He also dug a hole in front of where the Temple facade is going. Justin and I removed a small area of vampires so we could move a small display to the other side of the hallway. We did this so we would have enough room to walk behind the scenes when we put the new Ballroom in. Jesse worked on the area in front of the Temple facade leveling the area the bridge is going to sit on. At the end of the day we unloaded all of the Ballroom pannels Bryan loaded on the flatbed a few days ago.

We also found some baby bunnies and some eggs in a nest. Elgin also stopped by to take mesurements of the Temple facade so he can create some cad drawings of it.
No comments:
Post a Comment